Solicitation Documents (RFP and RFFP)
Division 00
Division 01
Appendices
UW Project Managers should work directly with their Contract Administrators to obtain any additional documents and to make any project-specific or other desired changes to the documents provided above.
Division 00
Division 01 General Requirements
Division 02 through 33
- Division 02 – 33 Table of Contents (pdf)
- Division 02 – Existing Conditions (zip)
- Division 03 – Concrete (zip)
- Division 04 – Masonry (pdf)
- Division 05 – Metals (zip)
- Division 06 – Wood, Plastic, Composites (zip)
- Division 07 – Thermal and Moisture Protection (zip)
- Division 08 – Openings (zip)
- Division 09 – Finishes (zip)
- Division 10 – Specialties (zip)
- Division 11 – Equipment (pdf)
- Division 12 – Furnishings (zip)
- Division 21 – Fire Sprinklers (zip)
- Division 22 – Plumbing (zip)
- Division 23 – Mechanical (zip)
- Division 26 – Electrical (zip)
- Division 27 – Communications (zip)
- Division 28 – Electronic Safety Fire Alarm (zip)
- Division 31 – Earthwork (zip)
- Division 32 – Exterior Improvements (zip)
- Division 33 - Utilities (pdf)
Appendix A
Division 00
- 00 42 46 Work Orders (pdf)
- 00 72 00 General Conditions (pdf)
- 00 73 20 Contractor Evaluation Criteria (pdf)
Division 01 General Requirements
Division 02 through 33
- Division 02 – 33 Table of Contents (pdf)
- Division 02 – Existing Conditions (zip)
- Division 03 – Concrete (zip)
- Division 04 – Masonry (pdf)
- Division 05 – Metals (zip)
- Division 06 – Wood, Plastic, Composites (zip)
- Division 07 – Thermal and Moisture Protection (zip)
- Division 08 – Openings (zip)
- Division 09 – Finishes (zip)
- Division 10 – Specialties (zip)
- Division 11 – Equipment (pdf)
- Division 12 – Furnishings (zip)
- Division 21 – Fire Sprinklers (zip)
- Division 22 – Plumbing (zip)
- Division 23 – Mechanical (zip)
- Division 26 – Electrical (zip)
- Division 27 – Communications
- Division 28 – Electronic Safety Fire Alarm (zip)
- Division 31 – Earthwork (zip)
- Division 33 - Utilities (zip)