Description
The project consists of a renovation of a department chair’s suite (approximately 3,200 SF) on the third floor of Sieg Hall. Work will include reconfiguring the space into a contiguous chair suite to be used by faculty staff and students, selective demolition of walls to create contiguous chair suite, removal and addition of walls and doors, per site visit plan notes. The contractor will need to modify mechanical, electrical and plumbing to accommodate new suite configurations. The scope will include updating all finishes including paint and flooring, per the design documents. The contractor will need to coordinate with the furniture vendor on their installing of new furniture elements (furniture not in scope). Rough-in and coordination to facilitate installation of IT scope (being installed by UW IT) is also required.
There is an additive alternate that includes new window treatments.